Success Stories

Solar Field Housing Rapid Volume Increase

Summary
  • Existing customers product needed rapid increase in output to support new contract.
  • Automation and advanced machining techniques were needed.
Challenges
  • Need to find manufacturing space, machining equipment and robotics to meet demand.
  • Timing was compressed to support customers new contract.
Pollington solutions
  • Located and repurposed an existing local facility.
  • Created a multi stage plan to support ramp from lower volume to increased.
  • Aquired six additional CNC machines and four robots.
  • Invested in personnel and training to develop fully automated machining solution.
  • A seventh, more advanced CNC and two additional robots added at a later stage to reduce cycle times and add significant capacity.
end Result
  • First stage of increased output began ramping within 8 weeks of award.
  • Full volume was achieved that same year.
  • Final production facility capable of running full contract volume with Pollington as single supplier for up to three shifts with minimal human labor (near full automation).

OTHER SUCCESS STORIES

Launched Large FAB Project

European customer needed supplier for global reach multi-site project requiring hundreds of different complex fabrications.
Read More

8 Foot FSW Extrusion Assembly

Pollington was chosen by a leading automaker to take over difficult machining and assembly of long extrusions
Read More

READY TO GET STARTED?

Our team is ready to help. Reach out today for a quote and see how our commitment to your success helps drive ours.